Showing posts with label The Chapel. Show all posts
Showing posts with label The Chapel. Show all posts

Tuesday, May 19, 2026

Afterthoughts.....

 


The Chapel Door Panels....

I Might have mentioned a time or two, Dear Readers, that The Castle project was undertaken many years ago with a great deal of enthusiasm and a quite minimal "plan" of action. The structure was going to be built from plywood in three basic "blocks" which would allow for moving and constructing in stages. The general idea was that I would finish the lowest room in each "block" before attaching its ceiling, which would be the floor of the next room up. The higher room would not be built until the lower one was substantially completed. I immediately built the three "rough" blocks that comprise the basic structure, with floors cut and loosely "shelved" in place but not attached. With three sections to work among, I still had plenty of flexibility about which room to be working on at any time. I had not yet decided whether there would be "opening front walls" or whether the entire structure would remain open on one side (as most American designed dollhouses are). I was pretty sure I would want those opening front walls eventually... but that was years down the road. And of course, you know I did add those opening front walls, already many years ago, but had not thought out the entirety of their construction. They were added as a single panel split in the middle and hinged at both sides for each room. Meanwhile, many other parts of The Castle had seen "upgrades" to the original structure... window and door trims... corner "strengthening" structural pieces and ceiling "trim rocks" galore. But the opening door panels were pretty much still just the plywood panel hinged to open. But over time and use I have come to realize some structural upgrades are needed for these opening door panels! Specifically, they need to overlap where they meet in the center (they don't always meet exactly evenly!) and they need "backstops" to keep them from being pushed too far inward. And since I am currently embarking on The Chapel front opening panel windows and trims and paintings.... what better time than now to tackle this large topic? The above picture shows you The Chapel and the room above it with their opening front walls removed... with flash so you can really see the structure in its bare bones.

 
Here you can see The Chapel opening front wall
 with the doors attached, lying aside for repairs. 
This is the view you will not be able to see
 once The Chapel is completed, 
the interior side of the opening wall in its entirety. 
I had already "roughed in" the paint and basic outline
 for the two remaining murals (The Annunciation 
on the left and The Tower of Babel on the right) 
two years ago when I last worked on  The Chapel. 
You can also see the newly added stained 
glass windows are in place. 
And yes, the painting for the Annunciation 
will have to be split on one side.
This is unfortunate, but unavoidable, 
and at least the picture will be largely intact. 
You can also see I have cut away a section
 of the "rock" edging that runs along below the windows. 
This is to make room for the "door overlap panel"
 that needs to be added.

 
Here you can see I am gluing the door overlap panel 
to the right side panel (as seen from the interior), 
and weighted it with my measure tape and a lovely block of agate.
 I have left the door panels hinged to the outer wall
 to be sure the alignments stay accurate. 

 
I gave the opening door panel a test in place. 
You can see from the outside it is the left hand door
 that has the now added overlap panel, 
which will not show on the outside. 
It covers the crack between the doors
 on the inside when they are closed.

 
Here you can also see I have added a "door stop" 
at the very top on the inside of the arched opening. 
It hangs just low enough to stop the doors from pushing inward.
 And here I have started painting the overlap panel
 to resemble the rest of the wall structure....
 rocks below, mural above.

 
And because part of the Annunciation mural 
will land on this overlap panel... 
I needed to transfer the design to the panel 
and align it carefully with the other portion.

 
And adding the basic colors to the mural section... 
starting with the glorious blue background.

 
And adding the golden canopy and red framework.

 
Here you can see the entire wall with the overlap panel.

 
And with the interior window trims for the Chapel windows in place!
 I had constructed these two years ago when I last worked on this room.
 I can't tell you how glad I am that I added the opening panel overlap 
before I finished the wall murals!

 
And here you can see the opening wall propped up vertically
 to show light coming through the windows. 
Its not a great picture, but it gives you an idea
 of the effect from inside The Chapel.
 
Well, it might be an Afterthought, Dear Readers, 
but these little additions make a huge difference
 in the structural soundness of 
The Chapel opening door panels.

 

Thursday, August 8, 2024

And Then....

 


There Is The Chapel....

Do You even remember The Chapel? I must admit, Dear Readers, I was shocked, utterly shocked when I realized that the last time I worked on the Chapel was in 2011! Whaaat???? How could that be??? Thirteen years ago??? But it is true... I moved over to The Great Hall to get the Saints Ceiling painted first.... and then other stuff kept taking my focus. And somehow, here we are, I am finally ready to focus on The Chapel Tower.... and as with the other parts of this Huge project, I need to complete the Chapel before I can move up to the next room which is still bare plywood.

So Where was I when I stopped...? 
I was in the middle of painting the "frescoes" on the ceiling...


Can you even see them in there.... 
yes, I apologize for the dark photos...
I was just trying to assess the situation.... 
and it has been really gloomy around here...


And only half of the wall "frescoes" have been painted....


And in order to access the ceiling to paint it, 
we have to remove the front "proscenium" 
on both the chapel and the room above.
The ceiling is still removable!


And I have cleared out all the "stuff" 
that has been waiting in the Chapel...


At some point in the last dozen years,
 the altar candlestick on the left was bumped into
 and now it needs repair... the light still works... 
but the candlestick needs gluing and strengthening.


Here it is with the ceiling removed
 and the front wall to the Monk's Cell
 (in the far left corner )also removed...


And the partly painted ceiling sitting ready on my "easel chair".
The empty quadrant has always 
been going to portray the scenes of The Creation.
But perhaps the expulsion of the demons 
from Heaven should be completed first?

 
But before we go there, Dear Readers, 
as soon as the ceiling was removed
 I became aware of how far behind
 the rest of The Castle this part was....
What...? No corner strengthening posts? 
 
 No interior window trim in the Monk's Cell...?
(Well, here I have already begun to add it!)
And I am sorry for the dark pics...... 
I forget when I am taking them....
 
 

 
Incomplete electrical wiring.... 
No trim around the Postern Door...
Clearly I had my work cut out for me!
 

 I started with the easiest... 
the trim for the window in the Monk's Cell.


But I was really itching to get started on the painting.....
This is a close-up of where it was left off....
and I admit I was very nervous about starting in again!
I was really out of practice with this kind of painting... 
details in acrylic paint....
on something I had started thirteen years ago!
I started small....
 
Sorry, Dear Readers, I will have to leave it here...
all of a sudden blogger is not uploading my pictures...
I will have to continue at a later date.....
but rest assured... 
I am still painting on the Chapel....